Solar power for Basix alternate energy requirement – Long Jetty Central Coast NSW
Solar power Basix alternate energy requirement for two new townhouses
The client was a builder requiring alternate energy compliance for the new build. The solution was to provide a system of at least 1.5kW with the additional power to cover hot water generation.
The installation was done in three parts:
- DC Cables from roof to inverter were installed while the building was under construction and roof and walls were open.
- Installation of solar panels on each roof (five degree pitch) with tilt legs which faced the panels 22 degrees north for maximum production. The panels were installed away from the front roof edge as the client requested that they should not be seen from the road.
- Near completion of the project, the inverter and switchboard installations were done.
The system was designed with additional cables so that the future owners of the property could install more panels and upgrade or add an inverter.
Job specs
LOCATION
Long Jetty Central Coast NSW
ROOF DIRECTION
East, West
FINANCIAL INCENTIVES
$756 each
PANEL TYPE
Jinko 440W
SYSTEM SIZE
2.6kW
SOLAR PANEL PRODUCT WARRANTY
25 years
SOLAR PANEL PERFORMANCE WARRANTY
25 years
SOLAR COMPONENTS
Sungrow SG2.ORS-S
SOLAR COMPONENTS PRODUCT WARRANTY
10 years
This project is one of the many we've proudly completed across the Central Coast.
Whether you need solar power for your home or electrical work for a renovation, we’ve got you covered.
Want to discuss your project? Get in touch with us today for expert solar and electrical solutions.